01 / You're here if…

    A GCC outgrowing its model (300–1,500+ FTE)

    02 / The question we answer

    Is the constraint mandate, decision rights or leadership bench?

    03 / How we work

    Built around the work that matters.

    Build and scale a GCC with mandate clarity, organisation design, decision rights, governance cadence and scorecards.

    Diagnostic Sprint

    A 2–4 week Diagnostic Sprint examines the mandate, organisation and operating interfaces. It identifies the gaps to address and defines the next delivery scope.

    Where operating confidence breaks down.

    The centre is growing, but its mandate and decision rights have not kept pace. You need clarity on what the GCC owns, how headquarters works with it and how performance will be governed.

    What we deliver

    • 01A clear GCC mandate tied to the enterprise's operating priorities.
    • 02Organisation design with explicit roles and accountability.
    • 03Decision rights between headquarters and the GCC.
    • 04A governance cadence for decisions, performance and escalation.
    • 05Scorecards that connect delivery performance to the mandate.
    04 / Framework used

    A clear way to make progress visible.

    FRAMEWORK / 01

    Scale Architecture

    Align the mandate, organisation, decision rights and governance cadence so the operating model supports the centre as it grows.

    05 / Relevant case

    The volume didn't break the operation. The missing system did.

    As Head of India GCC at Jumio, Chirayu Vaidya led the response during the 2017–18 crypto boom, when daily verification volumes jumped from ~100K to 350K+ almost overnight and stayed there for six weeks. Turnaround slipped from minutes to seven days and the backlog hit 1.8 million. Quality dipped from 98% to 95% during the surge; it was restored to 98% within 3–4 months and later raised to 99.1%. Hiring more people alone could not fix the operation's missing scale system. Chirayu rebuilt the live operation, splitting work into separate steps and queues, accelerating capacity through cross-skilling, overtime and onboarding a vendor partner, replacing manual Excel reporting with live Power BI dashboards, and running a daily war room with delegated authority and clear decision rights. Within 3–4 months, SLAs were back to minutes and the team had grown from 900 to 2,500 people.

    Chirayu Vaidya, Founder & Managing Partner (former Head of India GCC, Jumio)

    Read the full case study →

    Frequently asked questions

    We provide an India GCC setup playbook covering legal entity structure, location strategy, talent branding and facility setup, plus the operating model the centre will run on: leadership structure, decision rights between headquarters and the GCC, and governance cadence. The aim is a centre built for strategic value, not just labour arbitrage.

    Usually somewhere between 300 and 1,500 FTE. The informal management that worked at a few hundred people stops working: decisions bottleneck at headquarters, leadership layers are thin, and quality and throughput start to slip. Valiarch redesigns org structure, decision rights, leadership layers and governance cadence so the centre can scale without breaking.

    Often the answer is a hybrid: a captive core for strategic, high-judgment work, with partners providing flexible capacity and niche skills. Valiarch designs the partner ecosystem and the governance between captive and partner teams, so you keep control without carrying every capability in-house.

    Two-in-a-Box pairs a GCC leader with a counterpart at headquarters who share accountability for the same outcomes. It reduces the "us and them" gap between headquarters and the centre and speeds up decisions, and it is one of the operating model patterns Valiarch uses when designing GCC leadership structures.
    How we share the work

    Clear commitments on both sides

    We commit

    Method and process quality, agreed deliverables on schedule, controls installed and handed over, senior time.

    You own

    Decisions within agreed timelines, staffing and access to people and data, adoption, business results.

    Preconditions in every proposal: a named sponsor, decisions within an agreed number of days, and access to data and people. If the Diagnostic Sprint does not deliver the agreed outputs, we complete it at no extra fee.

    Next step

    Book a Diagnostic Sprint call

    Book a Diagnostic Sprint call